Azem Elektroteknik
/

Our Services

What we do on-site

When a fault is reported, our field teams follow these steps.

Fault Diagnosis & Repair

Fault code analysis, electronic/mechanical fault detection, and on-site repair.

Three-Phase Voltage Measurement

Detailed electrical diagnostics via L1-N, L2-N, L3-N, neutral-earth, and phase-to-phase readings.

Commissioning

Testing and activating newly installed charging units for operation.

Spare Parts Replacement

On-site part replacement backed by stocked field teams.

Warranty Tracking

Per-unit warranty period and coverage tracking.

Field Reporting

Every intervention is logged with photos, notes, and duration.

EV Charging Infrastructure & Field Support

Field operation and maintenance services for EV charging station owners and operators (CPOs).

  • —Periodic maintenance and field inspections
  • —Our team is on site and provides service within 72 hours of your request
  • —After a fault, the issue is resolved within 5 business days through service with spare parts
  • —Coverage across 81 provinces via mobile field teams
  • —On-site monitoring of station operational continuity

Electrical Infrastructure & Contracting

Installation, electrical project drawing and electricity distribution company applications for EV charging stations.

  • —Charging station installation: for infrastructure, a site assessment is carried out within 48 hours of your request, followed by installation.
  • —Electrical project drawing: the project for the electrical installation to be built is drawn up and prepared.
  • —Distribution company applications: the required applications are submitted to the electricity distribution company by our company.

Knowledge Center